Safe changes

Restore a working version when a change is not right

Studio creates a checkpoint before a change. After verification, keep the result or restore the earlier state without losing later user work.

Windows 10 or later or Ubuntu 22.04 or later (64-bit). macOS coming soon. About 1 GB of free disk space.

Windows may show a SmartScreen warning: click “More info”, then “Run anyway”.

Updated: .

How recovery works

  • Checkpoint before an edit

    Files and related project state are saved.

  • Result verification

    Studio builds the project and checks its main scenario.

  • Safe rollback

    Automatic rollback is allowed only to the checkpoint created for that change, and only when it cannot remove later user work.

Limitations

Production, payments, domains, secrets and irreversible migrations are never rolled back silently. Studio explains the risk and asks for explicit owner confirmation.

Questions

Does history replace a backup?

No. History helps with project edits, while production data and user files require a separately verified backup.

Can rollback delete my newer changes?

Studio must not auto-rollback if doing so would affect work created after the checkpoint.

Change the project with confidence.

Every significant edit begins with a recovery point.